首页> 外文期刊>Ship & boat international >Busy times for Fassmer
【24h】

Busy times for Fassmer

机译:法斯默的繁忙时间

获取原文
获取原文并翻译 | 示例
       

摘要

Fassmer, currently one of Germany's busiest specialist small vessel yards, is completing the LNG-powered, 75m x 16.8m survey, wreck location and research ship Atair for spring 2020 delivery to the Federal Maritime and Hydrographic Agency (BSH) in Hamburg. Fassmer is versed in the complexities of LNG ship construction, following its involvement with AG EMS in building Germany's pioneering first LNG ferry, the 83m Helgoland, in 2015 (see Ship & Boat International March/April 2016, pages 36-37). The €114 million (US$127 million) multipurpose Atair is just the first in a planned trio of LNG dual-fuel newbuilds. Replacing a 1987-built namesake, it is being outfitted on a hull completed earlier this year by German Naval Yards in Kiel, which also installed (at Fassmer's request) some initial equipment including LNG tank, piping and generators.
机译:目前是德国最繁忙的专业小型造船厂之一的法斯默(Fassmer)正在完成由LNG供电,长7500万x 1680万的调查,失事地点和研究船Atair,该船将在2020年春季交付汉堡的联邦海事和水文学局(BSH)。 Fassmer精通LNG船舶建造的复杂性,在2015年与AG EMS一起参与建造了德国首艘首批LNG渡轮,即83m Helgoland时(参见2016年3月/ 4月的国际船艇市场,第36-37页)。这套造价1.14亿欧元(1.27亿美元)的多用途Atair飞机只是计划中的三艘LNG双燃料新造船中的第一架。它取代了1987年建造的同名同名物品,已由德国海军造船厂在基尔(Kiel)于今年初完成建造,该船体还应Fassmer的要求安装了一些初始设备,包括LNG储罐,管道和发电机。

著录项

  • 来源
    《Ship & boat international》 |2019年第sepaoct期|54-54|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号