首页> 外文期刊>Sea Power >On To The Next Block
【24h】

On To The Next Block

机译:进入下一个区块

获取原文
获取原文并翻译 | 示例
           

摘要

Designers are looking at new capabilities for the fourth block of Virginia-class submarines.rn1. Block III improvements will be leveraged for expanded capabilities.rn2. Design opportunities include payload options, a redesigned sail and electric actuation.rn3. Life-cycle cost savings are essential to fund an increased production rate.rnThe ink is hardly dry on the Navy's multiyear contract for Block III of the Virginia-class nuclear-powered attack submarine and designers are busy preparing for the next version, Block IV, which will include new features and cost-saving measures.rn"Even though we just got a contract and there's been a lot accomplished, there's such urgency on my behalf to get something going as quickly as possible on what we're calling a DFA II - Design-for-Affordability II - in support of the Block IV," said John D. Holmander, General Dynamics' Electric Boat vice president and Virginia-class submarine program manager.
机译:设计师正在为弗吉尼亚级潜艇的第四块寻找新功能。 Block III的改进将用于扩展功能。设计机会包括有效载荷选项,重新设计的风帆和电动装置。节省生命周期成本对提高生产率至关重要。rnn海军与弗吉尼亚级核动力攻击潜艇的Block III多年期合同的墨水几乎不干,设计师正忙于准备下一个版本的IV Block,其中将包括新功能和节省成本的措施。rn“即使我们只是签了合同并且已经取得了很多成就,但我还是有迫切需要尽快将所谓的DFA II交付给我们。 -负担得起的设计II-支持第IV块,”通用动力公司电动船副总裁兼弗吉尼亚​​级潜水艇项目经理John D. Holmander说。

著录项

  • 来源
    《Sea Power》 |2009年第3期|28-30|共3页
  • 作者

    RICHARD R. BURGESS;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号