首页> 外文期刊>The Science of the Total Environment >Hydropeaking mitigation project on a multi-purpose hydro-scheme on Valsura River in South Tyrol/Italy
【24h】

Hydropeaking mitigation project on a multi-purpose hydro-scheme on Valsura River in South Tyrol/Italy

机译:意大利南蒂罗尔的瓦尔苏拉河上的一项多功能水文方案减水峰项目

获取原文
获取原文并翻译 | 示例
           

摘要

A hydropeaking mitigation project on Valsura River in the Italians Alps is described. The project is of particular interest due to several aspects. First of all, the Valsura torrent has unique morphological braiding characteristics, which are unique in the reach of Adige valley between Merano and Bolzano, and has a good reproduction potential for fish, especially in the terminal stretch along a biotope before its confluence with Adige River. Moreover, the Valsura hydropower cascade, which overall consists of six high-head hydropower plants, has an exceptional economic importance for the local hydropower industry. Lastly, the last HPP on the cascade is a multipurpose plant, so that interesting interactions between hydropeaking mitigation, irrigation supply and peak energy production are considered. The project started from a hydrological and a limnological measuring campaign and from an energetic, hydraulic and legislative framework analysis. The ecological findings are combined into a deficit analysis, founding the basis for the definition of a hydrological target state, which points to achieve a good natural reproduction for brown trout in the hydropeaked stretch, fulfilling at the same time the human safety conditions. Finally, mitigation Measures are described that at the same time comply with the following manifold aspects: a. maintenance of the requested target limits for fish reproduction; b. maintenance of the water release for the agricultural irrigation; c. enhancement of the flexibility of the hydropower plant's operation; d. reduction of the risk for local population. The paper compares operational and constructive mitigation measures and shows that constructive hydropeaking mitigation measures, for the present case study, can combine the positive effects of ecological improvement with higher safety standards and more flexible energy production.
机译:描述了在意大利阿尔卑斯山的瓦尔苏拉河上实施的减水措施。由于多个方面,该项目特别受关注。首先,Valsura洪流具有独特的形态编织特征,这在梅拉诺和博尔扎诺之间的阿迪杰河谷中是独特的,并且对鱼类具有良好的繁殖潜力,尤其是在与阿迪杰河汇合之前沿生物群落延伸的末端。 。此外,整体上由六个高水头水电站组成的Valsura水电梯级对当地水电行业具有非凡的经济意义。最后,级联上的最后一个HPP是多用途植物,因此考虑了减水峰,灌溉供应和峰值能源生产之间的有趣相互作用。该项目从水文和林学测量运动以及充满活力的水力和法律框架分析开始。将生态学发现结合到赤字分析中,为定义水文目标状态奠定了基础,该目标指出了在水峰期褐鳟获得良好的自然繁殖,同时满足了人类的安全条件。最后,说明了缓解措施,这些措施同时符合以下多个方面:维持要求的鱼类繁殖目标限值; b。维持农业灌溉用水的释放; C。增强水电站运行的灵活性; d。降低当地人口的风险。本文比较了操作性和建设性的缓解措施,结果表明,对于本案例研究,建设性的水峰缓解措施可以将生态改善的积极效果与更高的安全标准和更灵活的能源生产结合起来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号