The East Open Pits of Daye Iron Mine were closed in year 2000 and the ore beyond the pit limit was planned to be mined by underground ways. In order to facilitate the smooth transition to underground mining, hanging-wall ores in the old pits were scheduled to be mined. Xiangbishan pit is one of the four mining spots selected. In 1979 when the pit was mined to around 36 m a.s.l., a landside of around 70000 m~3 occurred in its North Slope, leading to the closure of the pit. The pit was then backfilled to 60 m a.s.l. to maintain the slope stability. The hanging-wall ore to be mined is just located below the old slide, so whether the slide will be reactivated and how to control its deformation and stability are the key issues concerned. Based on geological investigation and numerical analysis, it was predicted that the slide would be reactivated and a control measure using the intact ore body as a retaining wall was thus suggested. During mining, displacements were monitored to assure safety. By July, 2003, 383000 tons of ore were successfully mined. Though the observed displacement reached 8795 mm, no major failure happened. The final slope is 110 m high with an angle of 70°.
机译:大冶铁矿的东露天矿在2000年关闭,超出矿坑界限的矿石计划通过地下方式开采。为了促进向地下采矿的平稳过渡,计划在老矿井中开采壁挂式矿石。香壁山矿坑是选定的四个矿场之一。 1979年,当矿坑被开采到约36 m a.s.l.时,其北坡出现了约70000 m〜3的陆地,导致该矿坑被关闭。然后将矿坑回填至60 m a.s.l.保持边坡稳定。待开采的悬壁矿石就位于旧滑道的下方,因此,是否要重新激活滑道以及如何控制其变形和稳定性是相关的关键问题。根据地质调查和数值分析,预计滑坡将重新活化,因此提出了以完整矿体为挡土墙的控制措施。在采矿期间,对位移进行了监控以确保安全。到2003年7月,成功开采了383,000吨矿石。尽管观察到的位移达到8795 mm,但没有发生重大故障。最终坡度为110 m高,倾斜角为70°。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号