...
首页> 外文期刊>Rocky Mountain Construction >Pineview Dam Spillway Reinforcement
【24h】

Pineview Dam Spillway Reinforcement

机译:松景水坝溢洪道加固

获取原文
获取原文并翻译 | 示例
           

摘要

Aproject to reinforce the concrete spillway of Pineview Dam in northern Utah's Ogden Canyon was recently delayed at least 30 days, according to Don Merrill, spokesman for the Bureau of Reclamation, which built and maintains the structure. The reservoir behind the dam has been partially drained to enable workers to reinforce the concrete spillway's connection with the earthfill dam and to brace and reinforce the embankment. Steel struts and plates are being used to tie both spillway walls together.
机译:据建造和维护该结构的垦殖局发言人Don Merrill称,最近在犹他州北部奥格登峡谷(Ogden Canyon)加固Pineview大坝混凝土溢洪道的项目至少推迟了30天。大坝后面的水库已部分排干,以使工人能够加强混凝土溢洪道与土坝的连接,并支撑和加固路堤。钢支柱和钢板被用于将两个溢洪道墙绑在一起。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号