EILDON DAM SPILLWAY - SPILLWAY CHUTE EROSION ASSESSMENT AND PROTECTION

机译:EILDON DAM溢洪道-溢洪道滑道侵蚀评估和保护

获取原文
获取原文并翻译 | 示例
           

摘要

The Eildon Alliance is currently undertaking the upgrade of Eildon Dam as part of Goulburn Murray Water's dam improvement program. The Alliance is responsible for all aspects of the project, including planning, approvals, detailed design and documentation, construction and commissioning. The dam is an 80 m high zoned earth and rock fill embankment with a concrete lined spillway excavated through the left abutment. The spillway control structure is a 33 m high mass concrete dam, with a 60 m wide gated overflow section. The spillway chute is a 435 m long, 60 m wide concrete lined channel through steeply dipping fresh to highly weathered rock. The dam and spillway were originally designed to pass a peak discharge of 3 400 m~3/sec however recent hydrology indicates the current PMF discharge will be 6 900 m~3/sec. Work on the spillway upgrade included a physical model study that identified very poor flow conditions resulting in very large transient pressures. It was concluded that the existing concrete lined discharge channel will likely fail in relatively frequent flood events, with the potential for extensive erosion of the chute foundation. In a major flood event it is possible that the failure of the chute could ultimately lead to undercutting of the spillway structure. This paper discusses the design approach selected to secure the spillway structure including lifting of the concrete slabs, erosive potential of the underlying rock strata and erosion mechanisms of down cutting and back cutting once the chute has failed. The paper also includes a discussion of the international work in this field used to quantify the measures required to protect the spillway structure at Eildon Dam.
机译:Euldon联盟目前正在对Eildon大坝进行升级,这是Goulburn Murray Water大坝改进计划的一部分。联盟负责项目的各个方面,包括计划,批准,详细的设计和文档,施工和调试。该水坝是一个80 m高的土石填土路堤,其混凝土衬砌溢洪道穿过左基台开挖。溢洪道控制结构是33 m的高品质混凝土大坝,具有60 m的门控溢流段。溢洪道溜槽是一条435 m长,60 m宽的混凝土衬砌通道,通过将新鲜岩石陡峭地浸入高度风化的岩石中。大坝和溢洪道最初设计为通过3400 m〜3 /秒的峰值流量,但是最近的水文学表明,当前的PMF流量将为6 900 m〜3 /秒。溢洪道升级的工作包括一项物理模型研究,该研究确定了非常差的流动条件,从而导致非常大的瞬态压力。结论是,现有的衬砌混凝土排泄通道可能会在相对频繁的洪水事件中失效,并可能对滑槽基础造成广泛侵蚀。在重大洪水事件中,溜槽的故障有可能最终导致溢洪道结构的底切。本文讨论了为确保溢洪道结构而选择的设计方法,其中包括混凝土板的抬升,下层岩石地层的侵蚀潜力以及斜槽失效后向下切割和反向切割的侵蚀机制。本文还讨论了该领域的国际工作,以量化保护Eildon大坝溢洪道结构所需的措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号