ERS, Western Summit Install ECCV Pipeline

机译:ERS,Western Summit安装ECCV管道

获取原文
获取原文并翻译 | 示例
           

摘要

When East Cherry Creek Valley (ECCV) Water & Sanitation District needed a 14.5-mile pipeline and a pump station to move all that water, ERS Constructors-Pipeline Division of TIC, Highlands Ranch, Colo., and Western Summit Constructors Inc. of Denver came to the rescue and built one of Colorado's largest current pipeline projects on the fast track in less than one year. (ERS and Western Summit are subsidiaries of TIC Holdings of Steamboat Springs, Colo.) Until this May, ECCV was receiving a third of the water for its 50,000 customers in the southeastern Denver suburbs from nearby Aurora through a water trade agreement. Although negotiations to purchase water rights from the Willows Water District began in 1998 and ECCV bought the rights in 1999, the district couldn't move forward until the water rights decrees were finalized. Then Camp Dresser & McKee (CDM) of Denver completed the design before bidding could begin.
机译:当东樱桃溪谷(ECCV)水与卫生区需要14.5英里长的管道和泵站来输送所有水时,TIC的ERS建造商-管道部门,科罗拉多州的高地牧场和丹佛的Western Summit Constructors Inc.在不到一年的时间里就迅速进行了救援并在快速通道上建立了科罗拉多州最大的现有管道项目之一。 (ERS和Western Summit是科罗拉多州斯廷博特斯普林斯的TIC Holdings的子公司。)直到今年5月,ECCV通过一项水贸易协议从附近的Aurora为其东南丹佛郊区的50,000名客户获得了三分之一的水。尽管从1998年开始从Willows水区购买水权的谈判开始,而ECCV在1999年购买了水权,但直到水权法令最终​​确定之后,该区才能前进。然后,丹佛的Camp Dresser&McKee(CDM)完成了设计,然后才开始招标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号