A research program was undertaken to investigate the behavior of high-density polyethylene pipe during surface installation by horizontal directional drilling. In the fall of 1997, an instrumented high-density polyethylene pipe [55 m (180 ft) long, 200 mm (8 in.) in diameter, and dimension ratio of 17] was installed and monitored. Approximately 2 years later, three test pit excavations were completed to obtain in situ infor- mation along the bore, including pipe subsurface profile, characterization of site soils and bore slurry surrounding the pipe, location of the pipe in the bore, and pipe rotation and ovality.
机译:进行了一项研究计划,以通过水平定向钻井研究高密度聚乙烯管道在表面安装过程中的行为。在1997年秋天,安装并监视了仪器化的高密度聚乙烯管[长55 m(180 ft),直径200 mm(8 in。),尺寸比为17]。大约2年后,完成了三个测试坑的开挖,以获得沿钻孔的现场信息,包括管道的地下轮廓,管道周围的现场土壤和钻孔浆料的特征,管道在钻孔中的位置以及管道的旋转和椭圆度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号