Two of Wirtgen's largest cold mills-the W 2200 with 121/2-ft drums-kept a time-critical mill-and-fill runway resurfacing at one the world's busiest airports on schedule in fall 2007. Existing Runway 9R-27L has been Chicago O'Hare International Airport's second-longest runway. As part of a major airport expansion program, this runway is being lengthened, completely resurfaced and ultimately redesignated. Due to extremely heavy air-traffic loads, all reconstruction work was relegated to nighttime. "We are doing a mill and overlay in which whatever you grind has to be paved that night, with the runway open by 6 a.m.," said Bill Druggan, paving superintendent and project manager for Plote Construction Inc., Hoffman Estates, 111. The total length of the project was 152 ft wide x 9,180 lineal ft. "We typically grind about 12,300 sq yd per night and do a 3-in. grind and 3-in. overlay of about 2,100 tons of RAP in a five-hour period," Druggan said.
机译:维特根最大的两个冷轧机-带121/2英尺桶的W 2200-于2007年秋季在世界上最繁忙的机场按计划进行了时间紧迫的轧制和填充跑道重修。现有的9R-27L跑道一直是芝加哥奥黑尔国际机场的第二长跑道。作为大型机场扩建计划的一部分,该跑道正在加长,完全重新铺设和最终重新设计。由于极重的空中交通负荷,所有的重建工作都只能在夜间进行。 “我们正在做一个轧机和覆盖层,必须在当晚铺好所有碾磨物,并在早上6点之前开放跑道。”比尔·药甘(Bill Druggan)说,她是111霍夫曼庄园Plote建筑公司的铺路负责人兼项目经理。该项目的总长度为152英尺(宽)x 9,180平方英尺(英尺)。“我们通常每晚研磨约12,300平方米,并在5小时内进行3英寸研磨和3英寸覆盖约2,100吨RAP ”,Druggan说。

著录项

  • 来源
    《Roads & bridges》 |2008年第7期|p.34|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 公路运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号