...
首页> 外文期刊>Roads & bridges >AUDUBON BRIDGE OPENED EARLY
【24h】

AUDUBON BRIDGE OPENED EARLY

机译:AUDUBON桥提早开放

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

on an emergency basis because the rising Mississippi River caused the closure of the New Roads/St. Francis-vitle ferry. The Louisiana Department of Transportation and Development (DOTD) decided on the emergency opening to accommodate traffic that had lost river- crossing access when the ferry closed. The ferry carried about 720 vehicles a day. "Since this is an emergency situation, we've talked to the contractor and determined that it's 100% safe to allow traffic on the bridge at this time," said DOTD Secretary Sherri LeBas, RE.
机译:在紧急情况下,因为密西西比河的上升导致新路/圣路易的封锁。弗朗西斯-维特尔(Francis-vitle)轮渡。路易斯安那州运输与发展部(DOTD)决定紧急开放,以容纳渡轮关闭时失去过河通道的交通。渡轮每天运送约720辆车。 DOTD秘书谢里·里巴斯(Sherri LeBas)表示:“由于这是紧急情况,我们已经与承包商进行了交谈,并确定此时允许在桥上通行的车辆是100%安全的。”

著录项

  • 来源
    《Roads & bridges》 |2011年第7期|p.10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号