...
【24h】

DBR durability

机译:DBR耐用性

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

An alternative to full-depth repairs, the dowel bar retrofit (DBR) process involves inserting epoxy-coated dowel bars into an existing concrete pavement. Certain material requirements help ensure a successful DBR project. Rapid Set DOT Repair Mix meets the following DBR material requirements: achieves a minimum compressive strength of 3,000 psi in three hours and 5,000 psi in 24 hours (ASTM C-39); meets the shrinkage requirement of four days, 0.13% maximum (ASTM C-157); and develops bond strength of 1,000 psi in 24 hours (ASTM C-882). Rapid Set DOT Repair Mix is fast, has high bond strength and is extremely durable.
机译:替代全深度维修的销钉翻新(DBR)工艺包括将环氧树脂涂层的销钉插入现有的混凝土路面。某些材料要求有助于确保成功的DBR项目。 Rapid Set DOT修补混合物满足以下DBR材料要求:在3小时内达到3,000 psi的最小压缩强度,在24小时内达到5,000 psi的最小压缩强度(ASTM C-39);满足四天的收缩要求,最大收缩率为0.13%(ASTM C-157);并在24小时内达到1,000 psi的粘合强度(ASTM C-882)。 Rapid Set DOT修补混合料快速,具有高粘结强度并且非常耐用。

著录项

  • 来源
    《Roads & bridges》 |2015年第6期|56-56|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号