Contractors often include in their subcontracts provisions that allow them to set off amounts otherwise due a subcontractor to compensate for damages it has incurred or anticipates will incur due to the subcontractor's breach of its obligations. These provisions are generally enforceable, and in many states the common law allows such set-offs-even absent express set-off provisions. When the contractor's damages are significant, set-offs are typically imposed early on before the remaining subcontract balance becomes insufficient to fund the full sum of the damages. But, as a recent case illustrates, a contractor might not be permitted to set off funds that were due and owing to the subcontractor before the incident.
机译:承包商通常在其分包合同中包含一些规定,允许他们抵销分包商的款项,否则应由分包商补偿因分包商违反其义务而引起的或预期会造成的损害。这些规定通常是可执行的,在许多州,普通法允许这种抵销,即使没有明确的抵销规定也是如此。当承包商的损失很大时,通常会在剩余的分包合同余额不足以支付全部损害赔偿之前就提前抵销。但是,如最近的一个案例所示,承包商可能不被允许抵消事件发生之前应归还给分包商的款项。

著录项

  • 来源
    《Roads & bridges》 |2015年第2期|18-18|共1页
  • 作者

    Larry Caudle;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号