首页> 外文期刊>RIBA Journal >MODEL PROCEDURE
【24h】

MODEL PROCEDURE

机译:模型程序

获取原文
获取原文并翻译 | 示例
       

摘要

PAUL morrell's Innovation and Growth Team report clearly pushed major project construction towards building information modelling (BIM) accelerating the direction of travel that is already being seen with both government and private sector clients. But what effect will BIM have on the day-to-day responsibilities of directors? One of a director's key duties is ensuring that properly considered and prepared appointment documentation is in place for all projects, and most issues associated with the use of BIM are common sense. There is not yet any'standard' appointment documents for BIM projects but mutually agreed'BIM clauses'can be appended to existing'standard' appointment documentation (such as RIBA SA 2010), just as other amendments are made.
机译:PAUL莫雷尔(Paul morrell)的创新与增长团队报告清楚地将大型项目建设推向了建筑信息模型(BIM),从而加快了政府和私营部门客户已经看到的出行方向。但是BIM对董事的日常职责会有什么影响?董事的主要职责之一是确保为所有项目准备好经过适当考虑和准备的任命文件,并且与BIM使用相关的大多数问题是常识。 BIM项目尚无任何“标准”任命文件,但可以像其他修订一样,将共同商定的“ BIM条款”附加到现有的“标准”任命文件中(例如RIBA SA 2010)。

著录项

  • 来源
    《RIBA Journal》 |2011年第6期|p.69-70|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:22:02

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号