首页> 外文期刊>RIBA Journal >Different reading
【24h】

Different reading

机译:不同的阅读

获取原文
获取原文并翻译 | 示例
       

摘要

A recent decision in the Technology & Construction Court has made it crucial that architects consider the precise wording of their collateral warranties - beneficiaries may now be able to adjudicate disputes in certain circumstances which arise under the warranty. In Parkwood Leisure Ltd v Laing O'Ro-urke Wales and West Ltd, Laing had entered into a standard JCT Design and Build contract with Orion Land and Leisure (Cardiff) to design and build a swimming and leisure facility in Cardiff. Under the contract it was required to enter into a 'deed of warranty' with Park-wood, which was to operate the facility. It did so before the works were finished. But once it was complete, a number of defects arose.
机译:技术和建筑法院最近的一项决定使建筑师考虑其附带担保的确切措辞至为关键-受益人现在可以在某些情况下裁定担保所引起的纠纷。在Parkwood Leisure Ltd诉Laing O'Ro-urke Wales and West Ltd案中,Laing已与Orion Land and Leisure(Cardiff)签订了标准的JCT设计和建造合同,以在Cardiff设计和建造游泳和休闲设施。根据合同,要求与运营该设施的Park-wood签订一份“保证书”。它是在工作完成之前这样做的。但是一旦完成,就会出现许多缺陷。

著录项

  • 来源
    《RIBA Journal》 |2013年第11期|81-81|共1页
  • 作者

    Stacy Sinclair;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:21:53

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号