首页> 外文期刊>Renewable & Sustainable Energy Reviews >Is the hydropower boom actually taking place? A case study of a South East European country, Bosnia and Herzegovina
【24h】

Is the hydropower boom actually taking place? A case study of a South East European country, Bosnia and Herzegovina

机译:水电热潮真的发生了吗?东南欧国家波斯尼亚和黑塞哥维那的案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

Over the last two decades, the world has experienced a boom in the number of hydropower projects. Considered an important part of sustainable development, particularly in post-socialist transition and developing countries, it is claimed that hydropower plants will make substantial contributions to environmentally friendly economic growth and poverty eradication. However, the so-called 'hydropower boom' has not resulted in a global mass construction of plants. In general, over-ambitious planning, a lack of funding opportunities and corruption are often put forward as explanations for the discrepancy between the number of plans and actual construction of hydropower plants. In this paper, it is added to these three reasons, illustrating with a case study from Bosnia and Herzegovina, where the planning of hydropower projects very rarely results in their construction. The results are based on secondary data and primary data, i.e. semi-structured interviews and informal talks, collected during fieldwork in Bosnia and Herzegovina. The data was analyzed using the analytical induction method. The results highlight how administrative complexity, over-estimations of exploitable capacity, an unattractive sociopolitical and socioeconomic situation and how these factors in combination create the conditions for various practices of corruption hinder the construction of plants. Comparing the results with other findings from around the world, the paper suggests approaching the so-called global hydropower boom with caution.
机译:在过去的二十年中,世界水电项目数量激增。被认为是可持续发展的重要组成部分,尤其是在后社会主义过渡时期和发展中国家中,可持续发展的重要组成部分,据称水力发电厂将为环境友好型经济增长和消除贫困做出巨大贡献。然而,所谓的“水电热潮”并未导致全球大规模建设电厂。总体而言,过分雄心勃勃的规划,缺乏资金机会和腐败往往被提出来解释计划数量与水力发电厂的实际建设之间的差异。在本文中,将其添加到这三个原因中,并以波斯尼亚和黑塞哥维那的案例研究为例进行了说明,在该案例中,水电项目的规划很少导致其建设。结果是基于波斯尼亚和黑塞哥维那野外工作期间收集的次要数据和主要数据,即半结构化访谈和非正式谈话。使用分析归纳法分析数据。结果表明,行政管理的复杂性,对可利用能力的高估,令人不悦的社会政治和社会经济状况以及这些因素如何共同为各种腐败行为创造条件,阻碍了工厂的建设。将结果与来自世界各地的其他研究结果进行比较,该论文建议谨慎对待所谓的全球水电热潮。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号