Performance Evaluation Of Jepirachi Wind Park

机译:杰皮拉奇风电场的性能评估

获取原文
获取原文并翻译 | 示例
       

摘要

This paper presents some technical details, operational experiences, and lessons learnt by the Colombian public utility - Empresas Publicas de Medellin - with a recently installed 19.5 MW wind park in the northern region of Colombia - province of La Guajira. This is the first ever wind park feeding to the electricity network in Colombia. The Jepirachi Wind Park was commissioned in April 2004 and it has to date accumulated nearly 180,000 h of operation. During that time 15 NORDEX N60/1.3 MW turbines have fed electricity to the Colombian main electricity grid. This work describes the park layout, including meteorological stations installed in the surroundings and the wind regime prevailing in the zone. Details are also given about remote monitoring of the Wind Park and individual turbines, through the Supervisory, Control and Data Acquisition system (SCADA Nordex Control 2). Since July 2004, Empresas Publicas de Medellin (EEPPM) and Universidad de Los Andes-Bogota, Colombia have been working together in a wind park performance monitoring programme. This has permitted both institutions to learn more rapidly matters relating to evaluation, planning and operation of wind parks exposed to extreme climatic conditions like those present in the semi-desert region of the Guajira. This work describes the wind park operation, where individual wind turbines have yielded monthly production capacity factors as high as 65-75%; values which are high when compared to similar turbines installed elsewhere. Accordingly, levels of electrical energy production of up to 1750 kWh/m~2-year per turbine have been measured, exceeding typical values reported in the wind energy literature. A series of operational and technical troubles have become evident, which are related to some of the particular features of the climate and the wind regime at the site of the Jepirachi Wind Park. Because of these local features it is suggested that a greater level of uncertainty (limiting the validity of methods and hypotheses) may exist in the study and planning of future wind parks in regions such as La Guajira.
机译:本文介绍了哥伦比亚公用事业公司Empresas Publicas de Medellin的一些技术细节,操作经验和经验教训,该公司最近在哥伦比亚北部地区La Guajira省安装了19.5兆瓦的风电场。这是哥伦比亚有史以来第一个向电网供电的风电场。 Jepirachi风电场于2004年4月投入使用,迄今为止已累计运行了18万小时。在此期间,有15台NORDEX N60 / 1.3 MW涡轮机向哥伦比亚的主要电网供电。这项工作描述了公园的布局,包括安装在周围环境中的气象站以及该区域中普遍存在的风况。还通过监控,控制和数据采集系统(SCADA Nordex Control 2)提供了有关风电场和单个涡轮机远程监控的详细信息。自2004年7月以来,麦德林国家公共经济局(EEPPM)和哥伦比亚洛斯安第斯-波哥​​大大学一直在开展风电场性能监测计划。这使两家机构都能更快地了解与暴露于极端气候条件下的风电场的评估,规划和运营有关的事项,例如瓜吉拉省半沙漠地区的风电场。这项工作描述了风电场的运行,其中单个风力涡轮机的月生产能力系数高达65-75%。与其他地方安装的类似涡轮机相比,该值很高。因此,已经测量出每台涡轮机的电能产生水平高达1750 kWh / m〜2年,超过了风能文献中报道的典型值。一系列的操作和技术故障已变得显而易见,这些故障与杰皮拉奇风公园所在地的气候和风况的某些特定特征有关。由于这些局部特征,建议在诸如La Guajira等地区的未来风电场的研究和规划中可能存在更大程度的不确定性(限制方法和假设的有效性)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号