...
首页> 外文期刊>River Research and Applications >Large dam renewals and removals-Part 1: Building a science framework to support a decision-making process
【24h】

Large dam renewals and removals-Part 1: Building a science framework to support a decision-making process

机译:大型水坝续订和删除 - 第1部分:建立一个科学框架来支持决策过程

获取原文
获取原文并翻译 | 示例
           

摘要

Altered rivers and managed flows are a hallmark of civilization and dams are a principal agent of alteration. Peak dam construction occurred at the turn of the last century in Western countries, and many of the largest dams are reaching the end of their service life. As a result, dam operators are increasingly facing a complex renewal/removal decision-making process in a large part because the economic and social values of dams have changed. The Mactaquac Hydroelectric Generating Station (New Brunswick, Canada), operated by NB Power Corporation (NB Power), is Canada's 25th largest dam and it is reaching the end of its service life. A decision is required for the dam's future state and three options were originally proposed: renew, rebuild, or remove. An overarching science framework was developed with NB Power to inform and support decision-making for the dam's decision process and an impending Environmental Impact Assessment. The framework guides research and monitoring for dam renewal/removal using science-based solutions that aim to minimize impacts on the aquatic environment while supporting an efficient and cost-effective decision-making process. The framework has five components: (a) establish long-term baselines of environmental conditions; (b) develop normal ranges describing the river's natural variability; (c) integrated physical and biological modelling; (d) assess the specific and cumulative state of fish passage; and (e) create and sustain a user-friendly geospatial data management system. In this paper we present a case study that implements the science framework (Part 1) through the Mactaquac Aquatic Ecosystem Study (MAES) with a view to revisit and assess its final impact post-project completion (Part 2).
机译:改变的河流和管理流量是文明的标志,大坝是改变的主要代理人。在西方国家的上个世纪之交发生峰值水坝建设,许多最大的大坝正在达到他们使用寿命的结束。因此,大坝运营商越来越多地面临复杂的更新/去除决策过程,因为大坝的经济和社会价值发生了变化。由NB Power Corporation(NB Power)操作的Mactaquac水电发电站(加拿大新不伦瑞克,加拿大)是加拿大的第25大水坝,它正在达到其使用寿命的结束。大坝未来状态要求决定,最初提出了三种选择:更新,重建或删除。一项总体科学框架是通过NB权力制定的,可通知和支持大坝的决策过程和即将发生的环境影响评估的决策。使用基于科学的解决方案的大坝更新/移除的框架指导研究和监控,旨在最大限度地减少对水生环境的影响,同时支持高效且具有成本效益的决策过程。该框架有五个组成部分:(a)建立环境条件的长期基线; (b)开发描述河流自然变异性的正常范围; (c)综合物理和生物学建模; (d)评估鱼类通道的具体和累积状态; (e)创建和维持用户友好的地理空间数据管理系统。在本文中,我们提出了一种案例研究,通过Mactaquac水生生态系统研究(MAES)实现科学框架(第1部分),以期重新审视并评估项目后项目完成后的最终影响(第2部分)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号