首页> 外国专利> Load bearing structure and construction process for agricultural buildings - includes steps of forming support piles, marking points for implantation of piles, and driving piles into ground and erecting preassembled structural framework on them

Load bearing structure and construction process for agricultural buildings - includes steps of forming support piles, marking points for implantation of piles, and driving piles into ground and erecting preassembled structural framework on them

机译:农业建筑的承重结构和施工过程-包括形成支撑桩,标记桩的位置,将桩打入地面以及将桩打入地下并在其上建立预组装结构框架的步骤

摘要

The process includes steps of supplying piles (10) designed with one pointed end to penetrate into the ground (S) and the other end to be hit with a tool, and inserting them into the ground so that they are in the correct position to take the structural framework (14a,14b) of the building (1). Preassembled load bearing components (2a,2b) are supplied with columns (6a,6b). These components are erected with the columns (6a,6b) aligned with the top of the piles (10). USE/ADVANTAGE - Construction of agricultural buildings. Quick to erect, cheaper, more stable once erected.
机译:该过程包括提供桩(10)的步骤,桩(10)的一端伸入地面(S),另一端用工具击打,然后将其插入地面,以使其处于正确的位置以取下建筑物(1)的结构框架(14a,14b)。预组装的承重部件(2a,2b)配有立柱(6a,6b)。这些组件以与桩(10)的顶部对齐的圆柱(6a,6b)竖立。用途/优势-农业建筑的建设。架设后可以快速架起,便宜,稳定。

著录项

  • 公开/公告号FR2698391A1

    专利类型

  • 公开/公告日1994-05-27

    原文格式PDF

  • 申请/专利权人 AGRION HABITAT RURAL SA;

    申请/专利号FR19920014056

  • 发明设计人 GIRARDIN JEAN-LOUIS;

    申请日1992-11-20

  • 分类号E04B1/35;E02D27/12;E04B1/18;E04H5/08;

  • 国家 FR

  • 入库时间 2022-08-22 04:33:42

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号