Know Your Contract The timing of bond claims on private developments can be tricky

机译:了解您的合同私人开发中的债券申索时间可能很棘手

获取原文
获取原文并翻译 | 示例

摘要

A couple of recent cases from the Court of Appeal demonstrate the timing of filing bond claims for work performed on private developments can depend on technical issues that are out of the contractor's control. As background, in addition to the mechanic's lien right, which must be perfected within a very short time frame, sometimes there are payment bonds recorded to protect the owner or developer from liens. On private works, these bonds are more common with respect to work performed in the public right of way (i.e., street paving or utility work). Whether the work is a "public-" or a "private work" has a drastic difference in the statute of limitations for bringing a bond claim, as the right on a public work is roughly six months after completion as compared to a four-year limitations period on a private works bond.
机译:上诉法院最近的一些案件表明,就私人开发项目进行的工作提出保函索赔的时间可能取决于承包商无法控制的技术问题。作为背景,除了技工的留置权(必须在很短的时间内完善)之外,有时还会记录付款保证金,以保护所有者或开发商免受留置权。在私人工程中,与以公共道路通行权进行的工程(即铺路或公用工程)相比,这些联系更为普遍。无论作品是“公共作品”还是“私人作品”,在提出担保债权的时效法规上都存在巨大差异,因为公共作品的权利在完成后大约六个月,而四年后私人工程保证金的时效期限。

著录项

  • 来源
    《Reeves journal 》 |2014年第4期| 8-8| 共1页
  • 作者

    Bruce D. Rudman;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号