首页> 外文期刊>RAIRO Operation Research >SIMULTANEOUS CONTROL ON LEAD TIME ELEMENTS AND ORDERING COST FOR AN INFLATIONARY INVENTORY-PRODUCTION MODEL WITH MIXTURE OF NORMAL DISTRIBUTIONS LTD UNDER FINITE CAPACITY
【24h】

SIMULTANEOUS CONTROL ON LEAD TIME ELEMENTS AND ORDERING COST FOR AN INFLATIONARY INVENTORY-PRODUCTION MODEL WITH MIXTURE OF NORMAL DISTRIBUTIONS LTD UNDER FINITE CAPACITY

机译:有限容量下具有正态分布有限公司混合的库存库存生产模型的提前期要素和订货成本的同时控制

获取原文
获取原文并翻译 | 示例
       

摘要

The significance of inflation and time value of money in inventory/production systems is indisputable for modern decision makers. Consequently, the paper aims to study the influence of inflationary condition on a stochastic continuous review integrated vendor-buyer inventory system in the presence of a multilevel reorder strategy for the system. It is considered that lead time components and ordering cost are controllable. Lead time is decomposed into its components: set-up time, production time and transportation time. Based on lead time components, demand during the lead time for different batches is assumed to be a mixture of normal distributions. The objective is to minimize joint inventory expected cost by simultaneously optimizing ordering quantity, reorder points of different batches, ordering cost, setup time, transportation time, production time and a number of deliveries under space constraint while the lead time demand follows a normal distribution. To minimize the expected inventory cost, a Lagrange multiplier method is applied in order to solve the problem, and an iterative algorithm is designed to find optimal values. The behavior of the model is illustrated in numerical examples. It was found that for a fixed value of transportation time, setup time and number of batches, with an augment in inflation rate, the two optimal reorder points for different batches were increased. Also, optimum joint expected annual cost with inflation for two kinds of customers' demand is larger than one kind of customers' demand. Furthermore, sensitivity analysis and managerial insights are given to show the applicability of the model.
机译:对于现代决策者而言,库存/生产系统中通货膨胀和货币时间价值的重要性无可争议。因此,本文旨在研究在存在多级重新订购策略的情况下,通货膨胀状况对随机连续审阅的综合卖方-买方库存系统的影响。认为提前期的组成部分和订购成本是可控制的。交货时间被分解成几个部分:准备时间,生产时间和运输时间。根据提前期组成部分,假定不同批次的提前期需求是正态分布的混合。目的是通过同时优化订货数量,不同批次的再订货点,订货成本,准备时间,运输时间,生产时间以及在空间限制下交付的数量,同时提前期需求遵循正态分布,从而最大程度地减少联合库存的预期成本。为了最大程度地减少预期的库存成本,应用拉格朗日乘数法来解决该问题,并设计了一种迭代算法来找到最佳值。数值示例说明了模型的行为。结果发现,对于固定的运输时间,准备时间和批次数量,随着通货膨胀率的提高,针对不同批次的两个最佳重新订货点增加了。此外,两种客户需求的最优联合预期年成本和通货膨胀率大于一种客户需求。此外,给出了敏感性分析和管理见解,以显示该模型的适用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号