...
首页> 外文期刊>Railways Illustrated >WSR Hymek D7018 Returns
【24h】

WSR Hymek D7018 Returns

机译:WSR Hymek D7018返回

获取原文
获取原文并翻译 | 示例
           

摘要

THE MUCH anticipated return of Hymek D7018 took a step closer when it undertook several test runs at the West Somerset Railway on October 24 (both loaded and engine only) in the company of Hymek D7017. D7018 last moved under its own power 23 years ago, in 1995, until it suffered a catastrophic engine failure in the August of that year and was removed from traffic. It was hoped that D7018 would have returned to traffic this year at the June Diesel Gala, but it had to donate parts to solve a last minute problem with D7017, to keep it going. With no major issues found during the test runs D7018 has been taken back inside for final work, ready for a return to service later in 2019.
机译:当Hymek D7018于10月24日在Hymerk D7017的公司在West Somerset铁路进行了几次试车(仅含装载和发动机测试)时,预期的回报将进一步接近。 D7018的上一次移动动力是在23年前,即1995年,直到那年8月,它遭受了灾难性的发动机故障,并被停飞。希望D7018能够在今年6月的柴油晚会上重新投入使用,但它必须捐赠零件来解决D7017的最后一个问题,以使其继续运转。测试期间没有发现重大问题,D7018已被带回内部进行最终工作,并准备在2019年晚些时候恢复使用。

著录项

  • 来源
    《Railways Illustrated》 |2019年第1期|23-23|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号