首页> 外文期刊>Railways Illustrated >What's happening to...?
【24h】

What's happening to...?

机译:怎么回事...?

获取原文
获取原文并翻译 | 示例
           

摘要

D9537 - Bury: Having returned from a visit to the Ecclesbourne Valley Railway, routine repairs have been completed on the 'Teddy Bear'. All the radiator elements have been replaced by refurbished equivalents removed from D9502. One side is now complete and tightened; the right hand side is held in place and needs nipping up before refilling with coolant. The exhaust system was dismantled on B-bank and the spilt flexible bellow from the turbo replaced; reassembly will now take place. The turbo had new mounting bolts fitted and 'double-nutted' to hopefully stop it coming loose again. The engine oil and hydrostatic oil were drained and it was refilled with fresh oil. The shafts were fully greased along with brake rigging and axle box guides, and the engine governor was changed and the centrifugal filter cleaned out. The fuel pump camboxes were refilled with oil and the turbo exhaust and intake sides had their oil changed.
机译:D9537-伯里(Bury):参观了埃克斯堡本山谷铁路(Ecclesbourne Valley Railway)后,“泰迪熊”的例行维修已经完成。所有散热器元件均已由D9502上的翻新产品替换。一侧现已完成并拧紧;右侧保持在原位,需要先夹紧,然后再填充冷却液。拆除了B-bank上的排气系统,并更换了涡轮机溢出的挠性波纹管;现在将进行重组。涡轮安装了新的安装螺栓并加了“双螺帽”以防止再次松动。排出机油和静液压油,并重新充满新鲜机油。轴以及刹车索具和轴箱导向装置已完全润滑,更换了发动机调速器并清理了离心过滤器。燃油泵凸轮箱重新加油,涡轮排气和进气侧换油。

著录项

  • 来源
    《Railways Illustrated》 |2017年第6期|36-38|共3页
  • 作者

    Pip Dunn;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号