D9551 - Bridgnorth: More progress was made on the loco's repaint into Golden Ochre on the weekend of October 22/23. The horn case is in second undercoat, and needs its first gloss. The cabside received grey primer and two top coats, while the doorframe area and leading end cab were stripped and a coat of primer was applied. The loco has completed a ten-hour shift on maintenance trains, but it will not work its first passenger trains until the May 2017 diesel gala.
展开▼