首页> 外文期刊>Railway Track and Structures >NS Crescent Corridor, Pa. coal lines track work
【24h】

NS Crescent Corridor, Pa. coal lines track work

机译:宾夕法尼亚州NS Crescent Corridor煤炭生产线跟踪工作

获取原文
获取原文并翻译 | 示例
       

摘要

A critical choke point on Norfolk Southern's Crescent Corridor has been eliminated with a reconfigured rail junction near Front Royal, Va. This was the final and most complex of six capacity-improvement projects in Northern Virginia to handle more trains at higher speeds.rnFunded by $43-million from the Virginia Department of Rail and Public Transportation and nearly $20 million from NS, the projects lengthened or built new passing tracks between Ma-nassas, Va., and Front Royal, installed five miles of double track near the Virginia Inland Port, improved signal and traffic control systems and increased train speeds through Riverton Junction near Front Royal.
机译:诺福克南部新月走廊的一个关键阻塞点已经消除,弗吉尼亚州弗雷特皇家附近的铁路交叉路口经过重新配置。这是北弗吉尼亚州六个容量提升项目的最后也是最复杂的,可以处理更多的火车,速度更高。rnD$ 43弗吉尼亚州铁路和公共交通部拨款1千万美元,国家安全局拨款近2,000万美元,这些项目延长或建造了弗吉尼亚州马纳萨斯和皇家前线之间的新过往轨道,并在弗吉尼亚州内陆港口附近安装了5英里的双轨铁路,改进了信号和交通控制系统,并通过Front Royal附近的Riverton Junction提高了火车速度。

著录项

  • 来源
    《Railway Track and Structures》 |2010年第9期|P.5|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:27:32

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号