...
首页> 外文期刊>Railway Gazette International >Plans take Shape for 2030 network
【24h】

Plans take Shape for 2030 network

机译:计划为2030年网络铺平道路

获取原文
获取原文并翻译 | 示例
           

摘要

Not long ago plans were being drawn up for a second stage in the Bahn 2000 programme. Changes in transport policy, a shortfall in federal funding and an increase in the cost of building Switzerland's two base tunnels, plus the lack of a consensus on what should be included in a second stage, have altered the situation, and future developments are no longer so clear cut. The original intention had been to move ahead immediately after the first stage was completed, but this proved impossible. However, other major projects whose funding was approved by referendum in 1998 are unaffected: the Loetschberg and Gotthard base tunnels, and the programme to reduce railway noise, which covers both modifications to the rolling stock fleet and measures such as sound barriers to cut noise in built-up areas.
机译:不久之前,正在为Bahn 2000计划的第二阶段制定计划。运输政策的变化,联邦资金的短缺以及瑞士两条基本隧道的建造成本增加,以及对第二阶段应包含的内容缺乏共识,这改变了局势,并且未来的发展不再如此清晰。最初的意图是在第一阶段完成后立即前进,但这证明是不可能的。但是,其他在1998年获得全民投票批准的资金的主要项目则没有受到影响:Loetschberg和Gotthard基础隧道,以及减少铁路噪声的计划,该计划既包括对机车车辆的改造,也包括采取措施降低车内噪声的声屏障。建成区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号