...
首页> 外文期刊>Rail >Bold plans for a high-speed rethink
【24h】

Bold plans for a high-speed rethink

机译:高速重新思考的大胆计划

获取原文
获取原文并翻译 | 示例

摘要

No part of HS2 Phase 2b will need to be built before 2040, say the promoters of a scheme which they claim will save money and meet Transport for the North's journey time and train frequency aims. Network North says it has compiled a demonstrator timetable which it claims can cut journey times by an average of 40%. Were its proposals to be adopted, Manchester Airport and Piccadilly stations would be turned into through stations, Bradford's two stations linked with a new cross-city line, and a new hub station provided at Sheffield Victoria. The closed Manchester-Sheffield Woodhead route would be reopened as a high-speed passenger route for the network, with a parallel trans-Pennine freight railway capable of providing a rolling highway lorry shuttle. Much of the wider network would be electrified, with 'urban metros' running to Blackpool South and between Bishop Auckland and Middlesbrough. The projected costs are estimated at £39.3 billion, with benefits estimated at £143bn, although Network North acknowledges that these are scaled from HS2's published benefits. The organisation says the high-speed spine could be delivered within ten years, and that 80% of all benefits could be delivered in a decade.
机译:在2040年之前,没有任何HS2阶段2B的部分,例如他们声称的计划的启动子,他们将挽救金钱并为北方的旅程时间和训练频率瞄准运输。网络北方表示已经编制了一个示威者时间表,它声称可以将旅程时间平均削减40%。曼彻斯特机场和皮卡迪利站将被转向代表,布拉德福德的两个电台与新的交叉城市线相连,以及在谢菲尔德维多利亚提供的新枢纽站。封闭的曼彻斯特 - 谢菲尔德木头路线将重新开放作为网络的高速客线,具有平行的跨宾尼货运铁路,能够提供滚动的高速公路车辆班车。大部分更广泛的网络将被带电,并在Blackpool南部和Bishop Auckland和Middlesbrough之间使用“城市Metros”。预计的成本估计为39.3亿英镑,余量估计为143亿英镑,尽管网络北方承认这些从HS2的已发表的福利缩减。该组织表示,在十年内可以提供高速脊柱,并且在十年内可以交付80%的福利。

著录项

  • 来源
    《Rail 》 |2020年第920期| 21-21| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号