首页> 外文期刊>Rail >GA's Aventra fleet to enter traffic later than planned
【24h】

GA's Aventra fleet to enter traffic later than planned

机译:通用航空的Aventra机队比计划的晚点进入飞机场

获取原文
获取原文并翻译 | 示例
           

摘要

CLASS 720 electric multiple units will not enter traffic with Greater Anglia this year as planned. Instead, they will become the third Bombardier Aventra fleet to be significantly delayed - perhaps by as much as a year - following the Crossrail Class 345s and London Overground '710s'. GA is being forced to apply for derogations to enable non-compliant EMUs to remain in traffic until their replacements are ready.
机译:CLASS 720电动多单元车今年将不会按计划进入大安格利亚。取而代之的是,它们将成为继Crossrail Class 345s和London Overground“ 710s”之后,第三批庞巴迪Aventra机队被大幅推迟(可能长达一年)。 GA被迫要求减损,以使不符合要求的EMU保持流量,直到准备好替换为止。

著录项

  • 来源
    《Rail》 |2019年第888期|28-29|共2页
  • 作者

    Richard Clinnick;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号