首页> 外文期刊>Rail business intelligence >Shakespeare Tunnel Class 395 works
【24h】

Shakespeare Tunnel Class 395 works

机译:莎士比亚隧道395类工程

获取原文
获取原文并翻译 | 示例
       

摘要

Southeastern services between Folkestone Central and Dover Priory were suspended from July 25 until August 31, enabling Network Rail to carry out a package of maintenance work as well as the creation of cross-passages between the twin bores of Shakespeare Tunnel.rnBecause the twin 1 268 m tunnels are close to the cliff face, they were constructed side-by-side in the 1840s with narrow vertical walls, making escape from a train through side doors impossible. HMRI therefore banned operation of trains without end doors through the tunnel.
机译:从7月25日至8月31日,福克斯通中央车站和多佛尔修道院之间的东南航线服务暂停,这使Network Rail能够执行一揽子维护工作,并在莎士比亚隧道的双孔之间建立交叉通道。rn因为有双1268 m条隧道靠近悬崖壁,在1840年代并排建造,垂直墙狭窄,因此不可能从火车通过侧门逃脱。因此,HMRI禁止运行没有端门的列车通过隧道。

著录项

  • 来源
    《Rail business intelligence》 |2009年第347期|4-4|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:16:39

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号