首页> 外文期刊>Rail business intelligence >High-output plant to boost renewals
【24h】

High-output plant to boost renewals

机译:高产量工厂以促进更新

获取原文
获取原文并翻译 | 示例
       

摘要

In its Delivery Plan for Control Period 4 (RB1340 p1), Network Rail reports that it is procuring an additional high-output track renewal system, together with a ballast cleaner and support plant of three tamping machines and two ballast regulators. NR says this equipment is 'essential' to the delivery of significant volumes of track renewals on primary routes where access needs to be minimised.rnIt will enter service from January 2011, initially on the West Coast Main Line. First to be delivered will be the ballast cleaner which is expected to be operational from April 2010.
机译:Network Rail在其《控制期4的交付计划》(RB1340 p1)中报告,它正在购买额外的高输出轨道更新系统,以及三台捣固机和两个压载调节器的压载清洁器和支撑装置。 NR说,这种设备对于在需要尽量减少出入的主要路线上提供大量的轨道更新是“必不可少的”。它将于2011年1月开始投入服务,最初在西海岸干线上。首先交付的是镇流器清洁剂,预计将于2010年4月投入使用。

著录项

  • 来源
    《Rail business intelligence》 |2009年第341期|2-2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:16:37

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号