首页> 外文期刊>Rail Business Intelligence >ICWC hiatus delays fleet upgrades
【24h】

ICWC hiatus delays fleet upgrades

机译:ICWC中断推迟了机队升级

获取原文
获取原文并翻译 | 示例
       

摘要

Industry insiders report that DfT is seeking to defer major work on the interCity West Coast rolling stock fleets until after the new full-length replacement franchise is let. The fleets affected are the Alstom Class 390s and the Bombardier Class 221s, both maintained by the manufacturer.Whilst the Class 390 Pendolino fleet is currently undergoing an H3 major overhaul combined with lengthening of 31 sets from nine to 11 cars, this should be followed by the first interior refurbishment since the fleet began to enter service in 2001.
机译:业内人士报告称,DfT正在寻求将西海岸城际机车车辆的主要工作推迟到新的全长替换专营权出让之前。受影响的车队是由制造商维护的阿尔斯通390级和庞巴迪221级,虽然390级彭多利诺目前正在进行H3大修,并从31辆加长到9辆增加到11辆。自机队于2001年开始服役以来,首次进行了内部翻新。

著录项

  • 来源
    《Rail Business Intelligence》 |2012年第427期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:23

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号