首页> 外文期刊>Rail Business Intelligence >London Midland cancellations continue
【24h】

London Midland cancellations continue

机译:伦敦中部地区取消活动仍在继续

获取原文
获取原文并翻译 | 示例
       

摘要

London Midland continues to plan its timetable on a daily basis as it works to manage an ongoing driver shortage (RB1425 p8). This situation is likely to continue until new rostering plans are introduced with the December 9 timetable change. The TOC was particularly affected over the recent half-term holiday when fewer drivers were available for rest day working. Since then, some days have seen a full service while others have seen a significant number of cancellations, with 30 of 1 200 scheduled services not running on November 10.
机译:伦敦米德兰(London Midland)继续每天计划时间表,以解决持续的驾驶员短缺问题(RB1425 p8)。这种情况可能会一直持续到12月9日时间表变更引入新的排班计划。在最近的半休假期间,TOC受到的影响尤其大,当时可供休息日工作的驾驶员较少。从那以后,有些日子已经提供了全面的服务,而另一些日子则取消了很多,在11月10日,1200个预定服务中有30个没有运行。

著录项

  • 来源
    《Rail Business Intelligence》 |2012年第426期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:14:25

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号