首页> 外文期刊>Rail Business Intelligence >Renewals expenditure sustained
【24h】

Renewals expenditure sustained

机译:续签支出持续

获取原文
获取原文并翻译 | 示例
       

摘要

Network Rail's expenditure on renewals in England Et Wales will rise to just under £2.6bn in 2013-14, the final year of the current Control Period 4. During CP5 it will then be sustained at around this level for the next four years. With much of the under-investment inherited from Railtrack corrected in CP3 and CP4, railway infrastructure is generally in a more sustainable position - with the exception of civil engineering assets.Risk-based asset policies balance renewal, component replacement and maintenance. Achieving the right balance should deliveT the required level of infrastructure performance in a sustainable way, giving the lowest whole-life cost.
机译:在当前控制期的最后一年,即2013-14年度,Network Rail在英格兰和威尔士东部的更新支出将增至将近26亿英镑。在CP5期间,此后四年将维持在该水平附近。在CP3和CP4中纠正了从Railtrack继承的许多投资不足之后,铁路基础设施通常处于更可持续的地位-除了土木工程资产。基于风险的资产政策平衡了更新,组件更换和维护。实现适当的平衡应以可持续的方式提供所需水平的基础架构性能,从而使整个生命周期成本最低。

著录项

  • 来源
    《Rail Business Intelligence》 |2013年第430期|8-8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:13:18

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号