首页> 外文期刊>Rail Business Intelligence >Phased programme for Class 365 refurbishment
【24h】

Phased programme for Class 365 refurbishment

机译:365类翻新的分阶段计划

获取原文
获取原文并翻译 | 示例
           

摘要

First Capital Connect returned the first of its refurbished Class 365 EMUs to revenue service on January 16. Owned by Ever-sholt Rail, the 40 Class 365s are receiving a C6X overhaul and refresh at Bombardier Transportation's llford depot in east London. Originally awarded to Rail-care, the contract was terminated when that company went into administration in July 2013 [RB1444 p5). The contract was re-let (RB1451 p6) and Bombardier has rolled out the first unit nine weeks after contract award.
机译:First Capital Connect于1月16日将其第一批翻新的365级EMU重新投入收益服务。由Ever-Short Rail拥有的40台365级EMU在伦敦东部的庞巴迪运输公司的llford仓库接受C6X检修和更新。该合同最初授予Rail-care,但于2013年7月该公司开始管理时终止了合同[RB1444 p5]。合同被重新出租(RB1451 p6),庞巴迪在合同授予后九周推出了第一单元。

著录项

  • 来源
    《Rail Business Intelligence》 |2014年第454期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号