...
首页> 外文期刊>Rail Business Intelligence >RAIB reports on Heathrow Express derailment
【24h】

RAIB reports on Heathrow Express derailment

机译:RAIB报告希思罗特快列车出轨

获取原文
获取原文并翻译 | 示例

摘要

RAIB has issued its report into the derailment of an empty Heathrow Express Class 360/2 EMU at London Paddington at 05.20 on May 25 2014. The report concludes that the leading bogie of the third vehicle became derailed on a track defect which, according to Network Rail's standards, required repair within 36 h. It also concludes that the bogies on the TOS2 vehicle in the middle of the set had been set up incorrectly following tyre turning and that this had resulted in the left-hand wheels of the leading bogie being partially unloaded even when stationary. The track defect along Platform 3 exacerbated this unloading and contributed to the derailment. RAIB found that the incorrect set-up was the result of the repeated implementation by Siemens technicians, responsible for maintenance of the fleet at Old Oak Common depot, of a procedure aimed at setting the vehicle ride heights following tyre turning or bogie replacement. This procedure did not clearly instruct the technicians on how to adjust the anti-roll bar which resulted in them setting it in such a way as to create the wheel load imbalance.
机译:RAIB已针对2014年5月25日在伦敦帕丁顿空空的希思罗特快列车360/2级EMU脱轨发布了报告。该报告得出的结论是,第三辆车的前转向架因轨道缺陷而脱轨。 Rail的标准,要求在36小时内修复。它还得出结论,在轮胎转向后,TOS2车辆在转向架中间的转向架设置不正确,这导致前转向架的左轮即使在静止时也被部分卸载。沿3号平台的轨道缺陷加剧了这种卸载并导致脱轨。 RAIB发现不正确的设置是由负责维护旧橡树公共仓库车队的西门子技术人员重复实施的结果,该过程旨在设定轮胎转向或转向架更换后的车辆行驶高度。此步骤并未明确指导技术人员如何调整防倾杆,导致他们将防倾杆设置为造成车轮负载不平衡的方式。

著录项

  • 来源
    《Rail Business Intelligence 》 |2015年第485期| 7-7| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号