首页> 外文期刊>Rail Business Intelligence >Balfour Beatty builds Crossrail test facility
【24h】

Balfour Beatty builds Crossrail test facility

机译:巴尔福·比蒂(Balfour Beatty)建立Crossrail测试设施

获取原文
获取原文并翻译 | 示例
       

摘要

Bombardier Transportation has awarded Balfour Beatty a £12.5m contract to build a production, testing and office facility at its Derby plant for the Crossrail EMU fleet being supplied to TfL. Due for completion in 'winter 2016', the new facility will be able to accommodate four 10-car train-sets. Measuring 250 m by 40 m, the building will have four roads, each with OHLE and inspection pits along their full length. Office accommodation will be provided in a two-storey annex.
机译:庞巴迪运输公司已与巴尔弗·贝蒂(Balfour Beatty)签订了一份1250万英镑的合同,在其德比工厂建造生产,测试和办公设施,以向TfL供应Crossrail EMU车队。新工厂将于“ 2016年冬季”竣工,将可容纳四辆10车的列车。建筑物长250 m x 40 m,将有4条道路,每条道路的全长都设有OHLE和检查坑。办公室住宿将设在两层的附楼中。

著录项

  • 来源
    《Rail Business Intelligence》 |2015年第481期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:07

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号