首页> 外文期刊>Quarterly Report of RTRI >Modeling an Optimal Track Maintenance Schedule in Consideration of Timing of Grinding and Tamping
【24h】

Modeling an Optimal Track Maintenance Schedule in Consideration of Timing of Grinding and Tamping

机译:考虑磨削和捣固时间的最佳轨道维护计划模型

获取原文
获取原文并翻译 | 示例
           

摘要

Today, tamping machines and rail grinding machines are used to maintain ballasted tracks and to remove rail surface irregularities, respectively. Even though maintenance cycles could be extended and the total cost of maintenance could be reduced by efficiently combining these two machines, they are usually operated independently. As such, in order to estimate the effect of combining both these machines (combined maintenance), a model has been designed along with a scheduling system, as a simple method for preparing maintenance schedules which combine tamping and grinding. Investigations were also carried out to establish how long this type of maintenance lasts, and determine the optimum level of combined maintenance.
机译:如今,捣固机和轨道研磨机分别用于维护道maintain道and和消除轨道表面不平整。通过有效地组合这两台机器,即使可以延长维护周期并可以降低维护的总成本,但它们通常都是独立运行的。这样,为了估计将这两个机器组合在一起的效果(联合维护),已经设计了一个模型以及一个调度系统,作为准备将夯实和磨削相结合的维护计划的一种简单方法。还进行了调查以确定这种类型的维护可以持续多长时间,并确定组合维护的最佳水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号