首页> 外文期刊>Quarterly Report of RTRI >Back-fill Grouting Model Test for Shield Tunnel
【24h】

Back-fill Grouting Model Test for Shield Tunnel

机译:盾构隧道回填注浆模型试验

获取原文
获取原文并翻译 | 示例
           

摘要

Back-fill grouting of a shield-driven tunnel is significant not only for its effect of sta- bilizing the surrounding ground but also for that of acting as a load on tunnel. Back-fill grouting model tests have been carried out and the behavior of tunnel and the surrounding ground is discussed in this paper. Ground displacement and acting load on the model tunnel were measured during the grouting. As a result of the model testing, it is found that injec- tion pressure and ground densities significantly influence pressure of the tunnel and ground displacement.
机译:盾构驱动隧道的回填注浆不仅对稳定周围地面有重要作用,而且对隧道负重也很重要。进行了回填注浆模型试验,并讨论了隧道和周围地面的行为。在灌浆过程中测量了模型隧道的地面位移和作用载荷。模型测试的结果表明,注入压力和地面密度显着影响隧道的压力和地面位移。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号