...
首页> 外文期刊>Quarry Management >Hillhouse Quarry Revamp
【24h】

Hillhouse Quarry Revamp

机译:希尔豪斯采石场改造

获取原文
获取原文并翻译 | 示例
           

摘要

The addition of the new CS660 secondary crusher has allowed Hillhouse Quarry to reconfigure the site's existing Sandvik CH660 secondary crusher and four CH430 tertiary crushers, located in the main crusher building, as tertiary and quaternary units respectively. Whereas previously the old processing plant had a maximum total production capacity of 310 tonnes/h, comprising 100 tonnes/h through the bottoming plant and 210 tonnes/h through the old secondary and tertiary crushers, the newly upgraded plant has boosted total production capacity to 450 tonnes/h.
机译:新的CS660二级破碎机的加入使Hillhouse Quarry可以重新配置站点上现有的山特维克CH660二级破碎机和四个位于主破碎机大楼中的CH430二级破碎机,分别配置为三级和四级单元。以前,旧加工厂的最大总生产能力为310吨/小时,其中自底压工厂的最大总产能为100吨/小时,旧的二级和三级破碎机的最大总产能为210吨/小时,而新升级的工厂将总产能提高至450吨/小时

著录项

  • 来源
    《Quarry Management》 |2010年第5期|p.11-1215-16|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号