...
【24h】

In brief/

机译:字母/

获取原文
获取原文并翻译 | 示例
           

摘要

More waste Peel Environmental have been granted permission to increase the amount of inert landfill waste in the northern part of Marshall's Fletcher Bank Quarry, near Bury. Some 950,000m~3 of waste will be imported at a rate of 100,000m~3 per year, with the site due to be fully restored by 2038. Extension granted Kirklees Council has granted Wavin Ltd, suppliers of clayware products for the building, construction and utitities markets, a 10-year extension to their clay quarrying operations at Ox Lee Quarry, near Hepworth, following a slowdown in extraction rates during the downturn.
机译:更多的废物Peel Environmental已获得许可,以增加Bury附近马歇尔弗莱彻银行采石场北部的惰性垃圾填埋场废物数量。每年将以100,000m〜3的速度进口约950,000m〜3的废物,该厂址将在2038年前得到完全修复。扩建工程获得了Kirklees委员会的批准,Wavin Ltd.是建筑,建筑用陶土产品的供应商和公用事业市场,在低迷时期采掘率下降之后,将其在Hepworth附近的Ox Lee Quarry的粘土采石业务延长了10年。

著录项

  • 来源
    《Quarry Management》 |2013年第12期|6-7|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号