首页> 外文期刊>Quarry Management >Reaching New Heights
【24h】

Reaching New Heights

机译:达到新高度

获取原文
获取原文并翻译 | 示例
           

摘要

Operating the primary crushing section adjacent to a new working face situated at a high level at Fosso della Foresta Quarry posed a major challenge for family-owned Italian company Marocca Costruzioni. The main problem was the large altitude difference between the new quarry face situated 495m above sea level and the stationary processing plant some 200m below, with the gradient of the quarry haul roads between the two locations being more than 15°. After trying conventional trucking to move the primary crushed limestone down to the secondary processing area, it quickly became apparent that trucks were a costly solution, consuming a lot of tyres and fuel. An alternative totally truckless solution was crucial for the quarry's future. To this end, an economical and safe solution was found by choosing a Metso Lokotrack LT140 track-mounted primary jaw crusher and connecting it to a unique and flexible Nordberg mobile conveying system.
机译:在Fosso della Foresta Quarry高处的新工作面附近操作主破碎段对意大利家族企业Marocca Costruzioni提出了重大挑战。主要问题是位于海拔495m处的新采石场与位于下方200m以下的固定加工厂之间的高度差很大,两个地点之间的采石场运输道路的坡度超过15°。在尝试使用传统的卡车将一级破碎的石灰石下移至二级加工区域后,很快就发现卡车是一种昂贵的解决方案,消耗大量轮胎和燃料。完全无卡车的替代解决方案对采石场的未来至关重要。为此,通过选择美卓Lokotrack LT140履带式主颚式破碎机,并将其连接到独特而灵活的Nordberg移动式输送系统,找到了一种经济,安全的解决方案。

著录项

  • 来源
    《Quarry Management》 |2015年第5期|41-41|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号