...
首页> 外文期刊>Property Week >Battersea Residents Pump Up Treasury Attack
【24h】

Battersea Residents Pump Up Treasury Attack

机译:Battersea居民加快国债

获取原文
获取原文并翻译 | 示例
           

摘要

A residents association that has campaigned for the protection of Battersea Power Station since 1983 is gearing up for a fight with the station's new owner, Treasury Holdings.The Battersea Power Station Community Group has said it will fight plans by the Irish group to demolish a pumping station as part of its plans to carry out a £4bn redevelopment of the 38 acre site.In Treasury's Rafael Vinoly-designed scheme, a residential tower will be built on the site of the pumping station. Parkview was granted listed buildingconsent to demolish the pumping station in 1997 but this has since expired.A Treasury spokesman said: 'The masterplan for Battersea Power Station, published in June, built on the existing planning consent, which includes permission for removal of the pumping station. Nothing has changed since then.'
机译:自1983年以来,居民协会为保护巴特雷西发电站提供竞选,正准备与该车站的新老板,财政持股斗争。Batterea Power Station社区集团表示,它将通过爱尔兰集团摧毁一个泵站的计划,作为其计划的第38亿英亩的计划的一部分。在财政部的Rafael Vinoly设计方案中,一个住宅塔将建在泵站的场地。 Parkview被授予上市大楼同意在1997年拆除泵站,但这已过期。财政部发言人表示:“六月发布的巴特雷西电站的大师班,建立在现有的计划同意之上,包括拆除泵站的许可。从那以后没有任何改变。

著录项

  • 来源
    《Property Week》 |2008年第35期|4|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号