首页> 外文期刊>Project management journal >Construction Extension to the PMBOK~® Guide-Third Edition
【24h】

Construction Extension to the PMBOK~® Guide-Third Edition

机译:PMBOK〜®指南第三版的结构扩展

获取原文
获取原文并翻译 | 示例
       

摘要

Construction managers were building things-really big things-long before project management became popular. So, who needs a new construction extension to the PMBOK~® Guide? Well, probably construction managers. To be sure, construction projects are often scheduling problems of Brobdingnagian proportions. But such projects include matters more than scheduling that come into play in complex ways.rnThe Construction Extension to the PMBOK~® Guide-Third Edition, published by the Project Management Institute, addresses the full range of issues important to construction managers and describes generally accepted good practices for consideration and use by construction managers. Construction projects share many common aspects with projects in other domains.
机译:在项目管理开始流行之前,施工经理就在建造大型建筑。那么,谁需要对PMBOK〜®指南进行新的扩展?好吧,可能是建筑经理。可以肯定的是,建设项目经常会安排布罗布丁纳比例的问题。但是,此类项目所涉及的不仅仅是计划,而是以复杂的方式发挥作用。rn项目管理协会发布的《 PMBOK〜®指南》第三版的构建扩展解决了对构建经理重要的所有问题,并描述了普遍接受的问题。施工经理考虑和使用的良好做法。建设项目与其他领域的项目有许多共同的方面。

著录项

  • 来源
    《Project management journal》 |2008年第1期|98-98|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:45:09

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号