Bearing replacements for Forth Road Bridge approach viaducts

机译:第四路桥梁引桥的轴承更换

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The existing Forth Road Bridge spans the Firth of Forth in Scotland. The main suspension bridge, with central span of 1006 m, has two multi-span approach viaducts leading up to the main crossing. The deck of the approach viaducts comprises a pair of longitudinal steel box girders supporting a series of transversely spanning steel girders, both acting compositely with a reinforced concrete deck. The steel girders of the approach viaducts are supported on steel roller and rocker bearings on concrete portal piers which vary in height between 11 m and 40 m. An initial study of the bearings identified that the rollers had locked up due to corrosion and distortion, and the concrete beneath the bearings and elsewhere on the pier tops had deteriorated due to chloride contamination. Assessment showed that structural deficiencies in the pier were exacerbated by both the concrete deterioration and change in articulation. These factors led to the decision to replace all the bearings on the viaducts. This paper outlines the design of the strengthening and modifications to the bridge to facilitate bearing replacement, together with a detailed description of the design of the temporary works needed to maintain the bridge's articulation during jacking.
机译:现有的第四路大桥横跨苏格兰的第四峡。主悬索桥的中心跨度为1006 m,具有两个通向主交叉口的跨跨高架桥。引道高架桥的甲板包括一对纵向钢箱梁,这些梁支撑着一系列横向跨度的钢梁,两者均与钢筋混凝土甲板共同作用。高架桥的钢梁支撑在混凝土门墩上的钢制滚轮和摇杆轴承上,高度在11 m至40 m之间变化。对轴承的初步研究表明,滚轮由于腐蚀和变形而锁死,轴承下方和墩台顶部其他地方的混凝土由于氯化物污染而变质。评估表明,混凝土的劣化和咬合度的变化加剧了墩台的结构缺陷。这些因素导致决定更换高架桥上的所有轴承。本文概述了桥梁的加固和修改设计,以方便更换轴承,并详细说明了在顶进过程中保持桥梁铰接所需的临时工作设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号