Soil Improvement Works For An Offshore Land Reclamation

机译:海上土地复垦的土壤改良工程

获取原文
获取原文并翻译 | 示例
           

摘要

The Changi East reclamation project was carried out in five phases along the foreshore of the east coast of Singapore. The water depths in the reclaimed area ranged from 5 to 15 m. The project involved hydraulic placement of 272 million m~3 of sand onto soft seabed marine clay up to 50 m thick. A linear total of 170,000 km of prefabricated vertical drains (PVDs) were installed for accelerating the consolidation process of the underlying soft marine clay. The soil improvement works covered a total area of approximately 1200 ha. In this paper, the site conditions and the soil improvement works adopted are described. Pilot tests with full-scale field instrumentations as well as laboratory and in situ tests were carried out to verify the design, check the effectiveness of the soil improvement works using PVDs, and establish the most suitable drain spacing. Field monitoring data obtained from both the pilot tests and the reclamation works are presented and interpreted. Degree of consolidation was calculated based on both settlement and pore pressure data.
机译:樟宜东部填海工程沿新加坡东海岸的前岸分五个阶段进行。填海区的水深为5至15 m。该项目涉及将2.72亿立方米〜3的沙子水力浇注到厚达50 m的软质海底海洋粘土上。安装了总共170,000 km的线性预制垂直排水管(PVD),以加速下面的软质海洋粘土的固结过程。土壤改良工程的总面积约为1200公顷。本文描述了场地条件和采取的土壤改良工作。进行了使用大型现场仪器的先导测试以及实验室和原位测试,以验证设计,检查使用PVD进行土壤改良工作的有效性,并确定最合适的排水间距。介绍并解释了从中试和填海工程中获得的现场监测数据。根据沉降和孔隙压力数据计算固结度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号