...
首页> 外文期刊>Proceedings of the Institution of Civil Engineers >Operation of a damaged prestressed-concrete girder bridge with repair in Japan
【24h】

Operation of a damaged prestressed-concrete girder bridge with repair in Japan

机译:在日本对已损坏的预应力混凝土梁桥进行维修的操作

获取原文
获取原文并翻译 | 示例

摘要

The Myoko Bridge is a prestressed-concrete (PC) box-girder bridge located in the heavy-snowfall area in Japan. It was opened in 1972, and failure of PC cables due to severe corrosion was found in 2009. It was decided to replace the bridge with a new one based on results of a detailed survey in 2011. It will take 10 years or longer until the new bridge is completed; therefore, the damaged bridge is still used after repair and reinforcement. This paper first reviews the results of a survey on the PC cable failure and the repair work in 2011, when outer tendon cables were installed, reported by the bridge owner. The specific maintenance plan and emergency response system, which were developed based on results of loading tests and continuous structural monitoring, are also presented. Furthermore, a study of structural health monitoring (SHM) on the Myoko Bridge conducted by the authors is also introduced. Results of the quality evaluation of long-term fibre-optic strain data and the applicability verification of time-series analysis to the structural condition assessment are introduced in a discussion about using long-term SHM data in decision-making for bridge operation.
机译:Myoko桥是位于日本大雪地区的预应力混凝土(PC)箱梁桥。该桥于1972年开放,2009年发现PC电缆由于严重腐蚀而失效。根据2011年的详细调查结果,决定用新桥来代替该桥。要花费10年或更长的时间才能完成。新桥竣工;因此,受损的桥梁在维修和加固后仍可使用。本文首先回顾了桥梁所有者报告的有关2011年安装外部腱电缆时PC电缆故障和维修工作的调查结果。还介绍了基于载荷测试和连续结构监测的结果开发的特定维护计划和应急响应系统。此外,还介绍了作者在Myoko桥上进行的结构健康监测(SHM)的研究。在关于将长期SHM数据用于桥梁运营决策的讨论中,介绍了长期光纤应变数据的质量评估结果以及时间序列分析在结构状态评估中的适用性验证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号