首页> 外文期刊>Proceedings of the Institution of Civil Engineers >Improving safety through design at London Underground's Bank station capacity upgrade
【24h】

Improving safety through design at London Underground's Bank station capacity upgrade

机译:通过伦敦地铁银行站容量升级的设计来提高安全性

获取原文
获取原文并翻译 | 示例
       

摘要

Early contractor involvement during the design of the UK's London Underground Bank station capacity upgrade project helped to minimise health and safety risks. Design and construction teams for the sprayed-concrete-lined tunnel regularly interfaced to eliminate hazards where possible and, where not possible, control risks through best practice. This paper outlines some previous incidents from tunnelling projects in London. It then explains how these risks were dealt with through the Bank project tunnel design and how innovative, safety-related solutions were successfully implemented during construction.
机译:在英国伦敦地铁银行车站容量升级项目的设计过程中,承包商的早期参与有助于最大程度地降低健康和安全风险。喷射混凝土衬砌隧道的设计和施工团队定期进行交往,以消除危险,并在可能的情况下通过最佳实践控制风险。本文概述了伦敦隧道工程中的一些先前事件。然后,它解释了如何通过世行项目隧道设计应对这些风险,以及在施工过程中如何成功实施创新的,与安全相关的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号