...
首页> 外文期刊>Proceedings of the institution of civil engineers >Large-diameter piles in chalk - part 2, design and construction
【24h】

Large-diameter piles in chalk - part 2, design and construction

机译:粉笔大直径桩-第2部分,设计和建造

获取原文
获取原文并翻译 | 示例

摘要

The design of a 60-storey tall residential tower with a two-level basement in east London has had to take account of two London Underground tunnels which pass beneath the centre of the site, resulting in 'working' pile loads of up to 45 MN. The foundation solution comprised a stiff raft with cast in situ bearing piles up to 2.4 m dia. and 61 m long founding in the grade A/B chalk stratum. Some piles, using bentonite support fluid, needed to be constructed within the tunnel exclusion zones, which required a concession from London Underground. This paper presents the Osterberg-cell preliminary pile load test and results, foundation design, working pile construction and limitations on piles constructed in the London Underground exclusion zones. The paper also discusses the control on the bentonite support fluid properties and monitoring of its properties during pile construction.
机译:伦敦东部一栋有两层地下室的高六十层高的住宅塔的设计必须考虑到两条伦敦地下隧道,这些隧道在站点中心下方通过,导致“工作”桩荷载高达45 MN 。基础解决方案包括一个刚性筏,该筏上有直径达2.4 m的现浇轴承桩。在A / B级白垩岩层中长61 m。一些使用膨润土支撑液的桩需要在隧道禁区内建造,这需要伦敦地铁的特许权。本文介绍了Osterberg-cell的初步桩荷载测试和结果,地基设计,工作桩施工以及伦敦地下禁区的桩桩限制。本文还讨论了对膨润土载体流体特性的控制以及在桩基施工过程中对其性能的监控。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号