REALIZATION OF THE EXPERIENCE OF THE SAYANO-SHUSHENSKAYA HYDROPOWER PLANT IN CREATION OF CURRENT-TECHNOLOGY HYDROGENERATORS

机译:实现水力发电系统水力发电装置中南水北调水厂的经验

获取原文
获取原文并翻译 | 示例
           

摘要

The creation of a series of unique hydrogenerators for the Sayano-Shushenskaya hydropower plant (HPP) was an important step in the development of the industry. Their rated capacity and pole power (16.9 MV · A) considerably exceeded those of all earlier-generation hydroelectric generators. They implemented the best achievements of domestic electrical engineering. Some principal engineering solutions used in hydrogenerators of the Sayano-Shushenskaya HPP had been tested in earlier designed hydrogenerators, including those of the Krasnoyarsk HPP. These solutions include direct water cooling of the primary winding, forced air cooling of the exciting winding with the use of transverse channels in pole coils, a half-umbrella configuration of the generator with one guide bearing in the top spider and the toe resting against the turbine cap, and a shaftless design of the armature. It can be said that many of the novelties realized in hydrogenerators of the Sayano-Shushenskaya HPP have proved successful in operation but have not been employed by foreign companies. The design of hydrogenerators of the Sayano-Shushenskaya HPP went far ahead of the level of world hydroelectric engineering at the tirne and even today makes them an example of compactness, efficiency, and reliability. Table 1 presents the main data of world's largest hydroelectric generators built at approximately the same time.
机译:为Sayano-Shushenskaya水电站(HPP)创建一系列独特的水轮发电机是该行业发展的重要一步。它们的额定容量和极功率(16.9 MV·A)大大超过了所有早期水力发电机的额定功率和极功率。他们实现了国内电气工程的最佳成就。 Sayano-Shushenskaya HPP的加氢机中使用的一些主要工程解决方案已在较早设计的加氢机中进行了测试,包括Krasnoyarsk HPP的那些。这些解决方案包括直接对初级绕组进行水冷,对励磁绕组进行强制风冷,在极线圈中使用横向通道,发电机为半伞形结构,在顶部星形轮中带有一个导向轴承,并且脚趾靠在电动机上。涡轮盖和电枢的无轴设计。可以说,在Sayano-Shushenskaya HPP的加氢机中实现的许多新颖性已被证明可以成功运行,但尚未被外国公司采用。 Sayano-Shushenskaya HPP的水轮发电机的设计远远超过了提尔内世界水力发电工程的水平,即使在今天,也使其成为紧凑,高效和可靠的典范。表1列出了大约同时建造的世界上最大的水力发电机的主要数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号