首页> 外文期刊>Hydrotechnical Construction >Laboratory Investigations Of Lower-pool Hydraulics During Operation Of The Service Spillway At The Bureya Hpp
【24h】

Laboratory Investigations Of Lower-pool Hydraulics During Operation Of The Service Spillway At The Bureya Hpp

机译:Bureya Hpp溢洪道运行期间下池液压系统的实验室调查

获取原文
获取原文并翻译 | 示例
           

摘要

The performance of the lower pool during operation of a spillway is discussed.rnThe spillway dam of the Bureya hydroproject (Fig. 1) consists of eight spans each 12 m wide, which are situated at the head of the spillway with bulkheads each 3 m thick, is designed for the passage of flows in conjunction with the HPP: Q_(0.1%)= 10,400 + 2100= 12,500 m~3/sec, and Q_(0.01%) = = 11,200 + 2100 = 13,300 m~3/sec with a pool differential of 117 m. The pools are merged by a discharge of flow from the dam over a distance of 200 m in a diversion channel beyond a 140-m-wide spillway where the overall width of the river is 250 m, and the average depth 15 m in the case of maximum-flow passage.
机译:讨论了溢洪道运行期间下部水池的性能。rnBureya水利工程的溢洪道大坝(图1)由八个跨度各为12 m的跨度组成,这些跨度位于溢洪道的顶部,每个隔壁厚3 m。设计用于与HPP结合使用的流量通过:Q_(0.1%)= 10,400 + 2100 = 12,500 m〜3 / sec,Q_(0.01%)== 11,200 + 2100 = 13,300 m〜3 / sec池差117 m。在超过140 m宽的溢洪道(超过河流的总宽度为250 m,平均水深为15 m)的情况下,在200 m的距离上从大坝流出的水流汇合池最大流量通道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号