...
首页> 外文期刊>IEEE Transactions on Power Systems >The use of probability techniques in value-based planning
【24h】

The use of probability techniques in value-based planning

机译:在基于价值的计划中使用概率技术

获取原文
获取原文并翻译 | 示例

摘要

Present techniques used in value-based planning do not properly represent either the durations of power system capacity outage nor the effects of outage on post-interruption demand. Generation outage models do not relate the expected quantum of shortages to particular durations of outage. A model is proposed to compute this expectation by using the generator outage statistics in its entirety. The application of this model to the IEEE test system gave different results, depending on which outage cost data were used. Consequently, there is a need for a uniform procedure to report outage costs. A "bottom-up" procedure based on end use is proposed as a possibility.
机译:基于价值的计划中使用的当前技术不能正确地表示电力系统容量中断的持续时间或中断对中断后需求的影响。发电中断模型并未将预期的短缺量与特定的中断持续时间联系起来。提出了一个模型,通过使用整个发电机中断统计信息来计算此期望值。该模型在IEEE测试系统上的应用会得出不同的结果,具体取决于所使用的中断成本数据。因此,需要一种统一的程序来报告停机成本。提出了基于最终用途的“自下而上”的程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号